Home
Blog
Photos
Archive
Contact
About
Photos »
Projects
»
The Old Power Plant
»
The Rebuild
»
Interior
»
Step 08 - The Tile Edition
»
“Step 08 - The Tile Edition”
View this set @
www.
flick
r
.com
Mostly shots of the huge ceramic tile being installed in the lobby and outer hallway of the new office. It's nice stuff, and they did an awesome job.
Fig.1
Tile near an emergency exit
Fig.2
Lobby tile being installed
Fig.3
back wall of the lobby
Fig.4
Sally poses on wet tile
Fig.5
Sally makes out with Cat 5e
Fig.6
The new tile after a wipedown in the lobby
Fig.7
Something stuck to my lens
Fig.8
The outer hallway tile
Fig.9
Corner office
Fig.10
Sally miming office work